MOTORWAY BANGYAI – KANCHANABURI KM.1+119.007 TO KM.5+000.000 LT. AND KM.1+225.000 TO KM.5+000.000 RT. (SPUR LINE)
NAKHON PATHOM

Client :
Department of Highways

Designed By :
Department of Highways

Constructed By :
Christiani & Nielsen (Thai) PCL

Overview :
Construction of 6 lanes dual carriageway total length 3.828 km. Scope of work comprise of
– Road X-section – 3 sides of 10.80 m. width 6 cm. modified asphaltic concrete
surface, 5 cm. asphaltic concrete subsurface outsides of 3.00 m. & inside of
1.00 m. shoulder and depress median width 11.50 m.
– Service road x-section – 2 sides of 7.00 m. width 5 cm. asphaltic concrete
surface outside of 1.00 m.& inside of 1.00 m. shoulder, total length 5.093.814 m.
– New P.C. bridge (U-girder type, roadway 14.80 m.) with bridge approach
structure – 2 locations, total length 4.526.40 m.
– New overpass bridge (box girder type) with bridge approch structure – 1 location,
length 260 m.
– New R.C. pipe culvert dia 1.20 m. length 80 m. class II.
– Other involved M&E works and other road incidental works.