Client :
Department of Highways
Designed By :
Department of Highways
Constructed By :
Christiani & Nielsen (Thai) PCL
Overview :
Widening 2-lane Highway to 4-lane asphalt concrete surface Highway distance 14.637 km. (between km. no. 370+913.00 to km. no. 385+550.000).
Includes 3 new concrete bridges, road miscellaneous, drainage system, street lights, traffic signs and marking.