{"id":10338,"date":"2019-07-01T13:32:02","date_gmt":"2019-07-01T06:32:02","guid":{"rendered":"http:\/\/cn-thai.co.th\/en\/?p=10338"},"modified":"2019-07-01T13:34:06","modified_gmt":"2019-07-01T06:34:06","slug":"key-projects-awarded-in-june-2019","status":"publish","type":"post","link":"https:\/\/cn-thai.co.th\/en\/index.php\/key-projects-awarded-in-june-2019\/","title":{"rendered":"Key Projects Awarded in June 2019."},"content":{"rendered":"<p><strong>Civil work of LNG Tank for PTTLNG Receiving Terminal Project<\/strong><\/p>\n<p>SPCC Joint Venture (Saipem S.A. &#8211; CTCI Corporation), a main EPCC Contractor of PTTLNG Receiving Terminal Project, awarded us a contract of the civil works for 2 new LNG storage tanks with diameter 90 m. x height 49 m. The LNG terminal will possess a storage capacity of 7.5 million tonnes per year and is located in Nong Fab, Rayong.<strong><br \/>\n<\/strong><\/p>\n<p><strong>The Foundation Stone Laying Ceremony for Thaioil New<\/strong><\/p>\n<p>The Foundation Stone Laying Ceremony for Thaioil New Office Complex on June 26, 2019.<br \/>\nPresiding over the auspicious event and representing Thaioil PCL were Mr. Atikom Terbsiri, Chief Executive Officer and President (Middle) here pictured alongside Mr. Bandhit Thamprajamchit, Senior Executive Vice President Refinery and Petrochemical and also the Senior Executive Vice President Operation Excellence (Act.) (2nd left).<\/p>\n<p>Next to him is Mr. Viroj Wongsathirayakhun, the Executive Vice President Organization Effectiveness and also the Vice President People and Organization Management (Act.) as well as the Vice President assigned as the Managing Director of Thaioil Energy Services Co., Ltd. (1<sup>st<\/sup> left),<\/p>\n<p>Also pictured is Mr. Chatapong Wungtanagorn, Executive Vice President Corporate Commercial and taking a position of Executive Vice President Commercial Planning (Act.) (2<sup>nd<\/sup> right) and Mr. Jeerawat Pattanasomsit, Executive Vice President Manufacturing and taking a Position of Vice President Refinery (Act.) (1<sup>st<\/sup> right).<\/p>\n<p><img loading=\"lazy\" class=\"alignnone wp-image-10339\" src=\"http:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2-1024x768.jpg\" alt=\"\" width=\"700\" height=\"525\" srcset=\"https:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2-1024x768.jpg 1024w, https:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2-300x225.jpg 300w, https:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2-768x576.jpg 768w, https:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2-980x735.jpg 980w, https:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2-550x413.jpg 550w, https:\/\/cn-thai.co.th\/en\/wp-content\/uploads\/2019\/07\/Thaioil-2.jpg 1200w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Civil work of LNG Tank for PTTLNG Receiving Terminal Project SPCC Joint Venture (Saipem S.A. &#8211; CTCI Corporation), a main EPCC Contractor of PTTLNG Receiving Terminal Project, awarded us a contract of the civil works for 2 new LNG storage tanks with diameter 90 m. x height 49 m. The LNG terminal will possess a storage capacity of 7.5 million&#8230;<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[206,65],"tags":[],"_links":{"self":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts\/10338"}],"collection":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/comments?post=10338"}],"version-history":[{"count":4,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts\/10338\/revisions"}],"predecessor-version":[{"id":10343,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts\/10338\/revisions\/10343"}],"wp:attachment":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/media?parent=10338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/categories?post=10338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/tags?post=10338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}