{"id":10408,"date":"2019-08-05T15:39:10","date_gmt":"2019-08-05T08:39:10","guid":{"rendered":"http:\/\/cn-thai.co.th\/en\/?p=10408"},"modified":"2019-09-06T11:37:28","modified_gmt":"2019-09-06T04:37:28","slug":"key-projects-awarded-in-july-2019","status":"publish","type":"post","link":"https:\/\/cn-thai.co.th\/en\/index.php\/key-projects-awarded-in-july-2019\/","title":{"rendered":"Key Projects Awarded in July 2019."},"content":{"rendered":"<p><strong>Highway 3191 Map Ta Phut<br \/>\n<\/strong><\/p>\n<p>The Department of Highways awarded Christiani &amp; Nielsen (Thai) Public Company Limited a contract to construct the widening of a 6-lane RC road with an asphalt concrete surface and include the improvement of the existing pavement for 13.6 km of road, including 1 underpass, 3 new bridges, 12 widening of existing bridges and 2 pedestrian bridges of Highway Route No. 3191, located in Map Ta Phut, Nikhom Phatthana, Rayong province.<\/p>\n<p><strong>PU Application and Reactor Building Project<br \/>\n<\/strong><\/p>\n<p>GC Maintenance and Engineering Co., Ltd., awarded us a contract to construct of the Structural, Architectural, and MEP works for their new 3-storey PU Application and Reactor building and 1-storey chiller building with the scope inclusive of generator, transformer yard, elevator overhead cranes. The project consists of a total floor area of approximately 3,400 m2 and is located in Rayong, Chonburi.<\/p>\n<p><strong>Soy Milk Factory Line 3<br \/>\n<\/strong><\/p>\n<p>Green Spot Co., Ltd., awarded us a Design &amp; Construction Contract of an new production line including M&amp;E works for the Soy Milk Factory. The project consists of a total floor area of 310m2, located in Nong Khae Industrial Estate, Saraburi province.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highway 3191 Map Ta Phut The Department of Highways awarded Christiani &amp; Nielsen (Thai) Public Company Limited a contract to construct the widening of a 6-lane RC road with an asphalt concrete surface and include the improvement of the existing pavement for 13.6 km of road, including 1 underpass, 3 new bridges, 12 widening of existing bridges and 2 pedestrian&#8230;<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[206,65],"tags":[],"_links":{"self":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts\/10408"}],"collection":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/comments?post=10408"}],"version-history":[{"count":2,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts\/10408\/revisions"}],"predecessor-version":[{"id":10428,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/posts\/10408\/revisions\/10428"}],"wp:attachment":[{"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/media?parent=10408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/categories?post=10408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cn-thai.co.th\/en\/index.php\/wp-json\/wp\/v2\/tags?post=10408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}